Steward Seal Coating
Maintenance Planning

How Often Should a Church Parking Lot Be Seal Coated?

7 min read

One of the most common questions church facility managers ask is: How often should we seal coat our parking lot? The answer depends on traffic, weather exposure, and how proactively the asphalt has been maintained.

In Ontario's climate, seal coating isn't optional maintenance—it's a key part of protecting a major capital asset.

General Rule for Ontario Churches

For most church parking lots in Ontario:

  • Every 2–3 years is ideal
  • High-traffic areas may need more frequent attention
  • Low-traffic rural churches may extend to 3–4 years with good crack repair

Waiting too long increases long-term costs.

Factors That Affect Seal Coating Frequency

1. Traffic Patterns

Church lots experience:

  • Heavy use on weekends
  • Concentrated traffic near entrances
  • Occasional events causing spikes

High-turn zones wear faster than perimeter areas.

2. Sun Exposure

UV damage dries asphalt and accelerates oxidation—especially in open, unshaded lots.

3. Crack Maintenance

Lots with regular crack repair can:

  • Extend seal coating intervals
  • Prevent water infiltration
  • Reduce base damage

Neglected cracks shorten the life of seal coating.

Signs Your Church Lot Is Due

Look for:

  • Fading from deep black to grey
  • Rough or dry texture
  • Small cracks beginning to form
  • Previous seal coat wearing thin in drive lanes

These are early warnings—not cosmetic issues.

Why Churches Should Avoid "Waiting Until It's Bad"

Once asphalt begins breaking apart:

  • Seal coating is no longer effective
  • Resurfacing becomes the only option
  • Costs increase dramatically

Preventative seal coating is far more affordable than structural repair.

A Stewardship-Based Maintenance Cycle

Many Ontario churches follow a 3–5 year stewardship plan:

This approach supports budgeting, safety, and long-term planning.

When an Inspection Makes Sense

If you're unsure:

  • Schedule an inspection in spring or early summer
  • Use aerial assessments for larger properties
  • Document condition for board or committee review

A clear condition report simplifies decision-making.

Frequently Asked Questions

How often should church parking lots be seal coated in Ontario?

Most church parking lots in Ontario should be seal coated every 2–3 years, depending on traffic levels, sun exposure, and how well cracks are maintained.

What happens if seal coating is delayed too long?

Delaying seal coating allows water and salt to penetrate the asphalt, accelerating cracking and potentially leading to costly resurfacing instead of affordable maintenance.

Does crack repair affect how often seal coating is needed?

Yes. Regular crack repair helps preserve the asphalt base and can extend the effective lifespan of seal coating.

Ready to Protect Your Parking Lot?

Schedule a free drone inspection and get a professional assessment with no obligation. We'll provide honest recommendations based on your lot's condition.

Request Free Assessment
Call NowGet Quote